Modernization at Nissin


Centralized material flow control and multitenant WMS for Nissin

User:

Nissin, ELC Hamburg

Project:

Creation of centralized material flow control with highly configurable interfaces. This was made possible by the introduction of a multitenant warehouse management system while continuing to use the 28 S5 controls of the storage and retrieval systems.

MFC:

matCONTROL

WMS:

LFS 400 from Ehrhardt + Partner

Results of the Modernization:

 

  • The retrieval strategies were optimized, thus eliminating problems in control.

  • Problem handling was improved by the flexibility of the system.

  • The installed software is not only easy to modify, but also supports rapid and easy integration of further warehouse components in the future.

  • Improvements were also made in the area of routing and utilization of the conveyor system.

  • Overall, the logistics processes were optimized in such a way that the daily operating times were able to be shortened despite the same order volumes.

 

Time period:

3 month